Industrial Setup Checklist: From Land to Commissioning

The setup stages most projects pass through, and where delays usually come from.

Stage 1 — Site

  • Land or shed identified and title verified
  • Land-use permitted for industry
  • Power and water availability confirmed

Stage 2 — Approvals

  • Business registrations in place
  • Building plan approval
  • Consent to Establish from the pollution control board
  • Fire safety approvals

Stage 3 — Construction and machinery

  • Civil works schedule tied to machinery delivery
  • Electrical load sanction and installation
  • Machinery inspection before dispatch

Stage 4 — Commissioning

  • Consent to Operate and factory licence
  • Trial runs and product approvals
  • Manpower hired and trained
  • SOPs and quality checks in place

Most delays come from approvals started late and civil works that are not ready when machinery arrives. A single integrated schedule avoids both.

General information only — not legal, financial or investment advice. Requirements and figures vary by project and state.